The fluorescent lights of the Hallam warehouse didn’t just illuminate the room; they exposed every scar, every faded ink line, and every heavy silence sitting between the men of the South Eastern PL.
Major road upgrades in the 2000s and 2010s (including the Hallam Road level crossing removal project, completed in 2022-2023) required land resumption. The original ROC didn’t reflect the new road boundaries. A patch updates the ROC to match as-constructed conditions. roc south eastern pl hallam patched
Changes: