Tower Crane Dismantling Method Statement [better] (FHD)
Tower Crane Dismantling Method Statement [better] (FHD)
Tower Crane Dismantling Method Statement
1. Project details
- Project: Tower crane dismantling at [Project name / address]
- Client: [Client name]
- Contractor: [Contractor name]
- Crane make/model/ID: [e.g., Liebherr 175 EC-B], SWL: [tonnes]
- Dismantling date(s): [start — finish]
- Prepared by: [Name], Date: April 10, 2026
- Revision: 0
- Inspection and Testing: Conduct regular inspections and testing to ensure the crane is dismantled safely and efficiently.
- Documentation: Maintain accurate documentation of the dismantling process, including photographs and records of work performed.
- Risk Assessment: A thorough risk assessment will be conducted to identify potential hazards associated with the dismantling process.
- Permit to Work: A permit to work will be obtained from the site management, ensuring that all necessary safety precautions are taken.
- Notification: The site management, contractors, and relevant authorities will be notified of the dismantling schedule.
- Weather Conditions: Weather conditions will be monitored, and dismantling activities will be postponed in case of unfavorable weather.
- The jib and counter jib will be disconnected from the slewing unit.
- The jib and counter jib will be lowered to the ground using a mobile crane or a hydraulic crane.
- The jib and counter jib will be removed from the site.